Sapetro Tower Sewage treatment plant

a) Capacity : 300 m3/day
b) Kind of treatment : Primary and secondary treatment
c) Influent : BOD : 300 ppm , SS 270 ppm
d) Effluent : BOD : 20 ppm , SS 30 ppm
e) Location : Lagos – Nigeria
f) Consultant : Unecon – U.K.
g) Our scope of work : Study, Design and contracting.

Category:

Additional information

Weight 45 kg
Dimensions 33 × 22 × 454 cm
Select Color

Black, Blue, Red, White

Select Sizes

L, M, S, XS

Leave a Reply

Your email address will not be published. Required fields are marked *